How much does underpinning cost in Toronto?

Underpinning and basement-lowering permits in Toronto, priced from declared construction values — plus how long the permit takes, where the work concentrates, and what else lands in the same job.

$100K median declared value
$50K–$300K middle 50% of projects
1,361 permits in the sample
Distribution

The full spread, not an average

PercentileDeclared value
P25 — smaller jobs$50K
Median$100K
P75 — larger jobs$300K
Largest in sample$2.0M

1,361 permits with a declared value, trailing 36 months. Medians and quartiles only — one outlier can't move them.

Permit timeline

How long the permit actually takes

15 days median, application to permit issued
6–34 days middle half of applications
72% issued within 30 days · 1,875 permits measured

Measured from the date the application was filed to the date the permit was issued, on permits that reached issue. It excludes the design and engineering time before filing, which is usually the longer half of the wait.

Direction

Is this market growing?

Year appliedPermitsMedian declared
2024 478 $100K
2025 726 $100K
2026 · year to date 818 $90K

Counts are primary permits only — the plumbing, drain and HVAC permits filed alongside the same job are excluded so one project counts once.

Where it happens

Concentration across the city

DistrictPermitsShareMedian declared
West End 789 39% $100K
East York & East End 718 36% $85K
Downtown 234 12% $100K
Etobicoke 165 8% $100K
Scarborough 71 4% $65K
North York 36 2% $128K

Grouped by the first two characters of the postal code, so these are broad districts rather than neighbourhoods. See the live map →

The real project

What else is in the same permit

Residential alterations 1,992 permits 99%
Secondary suites 124 permits 6%
Multiplexes 107 permits 5%
Demolition 67 permits 3%

Share of these permits that also carry each scope. This is why quotes vary so widely — the same word can describe a standalone job or one line inside a much larger renovation.

Per square foot

Why there is no $/SF figure here

We publish a per-square-foot rate only where floor area is what the price actually scales with. For this work the correlation between area and declared value is 0.56 — too weak for a rate to predict your project. Multiplying your floor area by a published $/SF number would produce a confident-looking figure that the underlying permits do not support, so we show the value distribution instead.

What moves the number

Why two of these quote differently

  • Linear metres of wall underpinned and the depth of each pin — price is quoted per pin or per linear foot, and both scale with how far down you go.
  • Soil conditions and water table — dewatering and shoring change the job entirely.
  • Whether the scope includes a new slab, drainage and waterproofing (it usually does).
  • Access: a semi-detached with no side entrance means every bucket comes out through the house.
  • Bench footing instead of true underpinning — cheaper and faster, but it eats floor area, so the two are not interchangeable quotes for the same result.
Recent permits

Check it against the record

AppliedAddressDeclared value
Oct 2026 27 QUINCY CRES
Interior alteration of an existing single-family dwelling. The scope of work includes...
$35,000
Oct 2026 51 HALFORD AVE
Proposal for interior alterations, new exterior openings, underpinning, new basement...
$750,000
Sep 2026 1350 MOUNT PLEASANT RD
Underpinning of existing single family dwelling (67.4 linear m)
$30,000
Sep 2026 5 HIGHBOURNE RD
Proposed addition, interior alteration, underpinning, and new deck, to convert SRF to...
$500,000
Method

Where these numbers come from

Declared construction values on City of Toronto building permits (tier C), trailing 36 months, minimum 12 permits before a guide is published. A declared value is what the applicant stated the work is worth — it can sit below final hard cost, which is exactly why GROUND also publishes awarded contract prices.

Underpinning is the most common way a basement second suite becomes legal, so these projects frequently overlap with suite permits. Every underpinning job needs a structural engineer's drawings before permit, and the declared values here include that design work.

Data: Open Government Licence — Toronto. Recomputed automatically as new permits land; the figures above are current as of October 05, 2026.

GROUND services · Toronto & GTA

Pricing a project like this?

The numbers above are the market. For your project specifically — your address, your scope — we'll read the comparables, flag the permits you'll need, and check any quote you've been given against real awarded prices.

Free, no obligation. If you ask for introductions, your request goes only to the contractors we match — never onto a list.