Data refresh is delayed. Permit figures below are shown as of Oct 01, 15:03 UTC — not live. Normal service resumes automatically.
GTA · construction demand intelligence · refresh delayed

Know where construction demand is forming.

GROUND detects projects a median of 115 days before the building-permit stage. Planning applications, permits, tenders and the companies behind them — connected into one record of where GTA construction work is forming.

4 Hirondelle Pl41 Kingdom St2851 Kingston Rd201 Lloyd Manor Rd8 Brookfield St20 Bay St — $110,000145 Marlborough Pl75 Northcote Ave90 Wickson Trl
20,971 filings of the last 12 months, each at its own address. No basemap — the city is drawn by the permits themselves, and the empty edge is the lake. The 9 ringed marks are the newest on record.
496 projects detected before permit No building permit exists yet
115 days median early signal measured on 119 matched projects
378 tenders open now Ontario public construction
9,722 companies tracked bids, permits & awards resolved
63,612 permits tracked 42,121 geocoded $291.5M declared this week (+22% WoW)
The lead, measured

GROUND sees the project earlier

Not a claim — the median gap between the public records GROUND tracks, computed from filings that reached the next stage.

  1. 496 open pre-permit signals planning applications, licences and leases on record
  2. 10,485 permits filed in 90 days the first time most of the market sees a project
  3. 3,577 permits issued in 90 days work is cleared to start

A signal reaches a building permit a median of 115 days after it appears; a filed permit is issued a median of 28 days later. Based on 119 matched early-stage signals and 43,078 permit records. Stage counts are current volume, not one cohort followed through. See the places forming now →

Early signals

Projects appearing before permit

Planning and licensing activity showing construction intent before any building permit exists.

Design stage · Sep 03
3176 EGLINTON AVE E
Proposed a twenty-three (23) storey mixed-use building with a seven (7)... · M1J
Site plan under review — drawings exist; a building permit application is the typical next public step.
● No building permit detected yet
Comparable construction value $17.5M–$57.9M at 231,994 SF
Likely next public milestone — building permit application.
View intelligence →
Design stage · Apr 30
3377 BAYVIEW AVE
Site Plan Control Application for redevelopment of the subject site with... · M2M
Site plan under review — drawings exist; a building permit application is the typical next public step.
● No building permit detected yet
Comparable construction value $20.0M–$66.1M at 264,799 SF
Likely next public milestone — building permit application.
View intelligence →
Design stage · Aug 28
3020 KENNEDY RD
Proposed construction of 171 residential units within three-storey stacked... · M1V
Site plan under review — drawings exist; a building permit application is the typical next public step.
● No building permit detected yet
Comparable construction value $15.0M–$49.5M at 198,271 SF
Likely next public milestone — building permit application.
View intelligence →
Design stage · Feb 25
2275 SHEPPARD AVE E
Site Plan Control Application proposes the development of a 27-storey...
Site plan under review — drawings exist; a building permit application is the typical next public step.
● No building permit detected yet
Comparable construction value $19.5M–$64.4M at 257,838 SF
Likely next public milestone — building permit application.
View intelligence →

All 496 projects detected before permit →

Projects to watch

Unusually important this week

What is becoming important now: confirmed, significant activity in the market.

Who it's for

Built for the people chasing the work

Contractors

Find projects entering your scope before the bid is obvious — and see who else is already registered on them. Open work, priced →

Suppliers & manufacturers

Track where demand for your products is forming, by market, district and project stage.

Architects & consultants

Understand development activity, who owns it, and which competitors are active on what.

Developers & real estate

Benchmark construction activity, declared values and market direction against the whole GTA record.

The work board · free · no account

The tender board that shows you the price.

The paid portals sell you a list. GROUND's board is free and answers the two questions that decide a bid: can your crew do this job, and what has the same work been going for at real bid openings.

Sorted the way crews think

272 open municipal tenders, classified into trades and crew scale — 52 of them sized for a truck and a small crew. Concrete, drywall, snow, paving: each trade has its own page.

Priced by the market's own numbers

Every tender carries a most-likely price range built from past bid tabulations and awarded contracts — general building low bids are running a $772,676 median across 790 recent openings. Labeled honestly: a bracket to check your takeoff against, not a quote.

Winter is tendering right now

21 snow and winter contracts are open across Ontario municipalities this week. Free email alerts send new jobs in your trade — at most one email a day, unsubscribe in one click.

See the open work — free Snow & winter (21) · Concrete · Drywall · Paving · Watermain

Market pulse · last 30 days

Where GTA construction activity is moving

GTA construction picked up this week. Industrial was the strongest major category (↑10% over 30 days), while new residential applications fell 23%.

More markets: Demolition · Water / wastewater (62 tenders open) · Transportation (107 tenders open)

Submarkets: Underpinning · Secondary suites · Multiplexes · Garden & laneway suites · Residential alterations · Commercial interiors · Shoring & excavation · Demolition

Project intelligence

One project. The full picture.

Anne St Booster Pumping Station — City of Barrie
Water infrastructure Tender · FIN2026-032T GROUND Pro

GROUND can turn a tender package into an interactive project briefing: the full drawing set reconstructed into a navigable 3D view — click a structure to open its sheet, locate sections against plans, and toggle structural, concrete and piping disciplines. Understand the drawings, scope and project structure without spending hours opening PDFs.

See project intelligence in GROUND Pro →

  • OwnerCity of Barrie
  • StageTender
  • FacilityBooster pumping station
  • Likely scopesconcrete · process mechanical · electrical · civil
  • Drawing set138 sheets, navigable in 3D

Scopes are inferred from the tender documents — an interpretation, not a source field.

Market leaders · last 30 days

See who is actually active — not who has the best website

Bid registrations and permit applications of the last 30 days, resolved to company profiles.

All 9,722 companies →

Activity map

Where construction value is concentrating

  • West End
    371 permits · 43% of value
    $477.0M
  • East York & East End
    317 permits · 15% of value
    $171.0M
  • Etobicoke
    215 permits · 13% of value
    $140.0M
  • Downtown
    245 permits · 10% of value
    $111.9M
  • Scarborough
    270 permits · 8% of value
    $90.3M

Last 30 days · 42,121 permits geocoded from Toronto Address Points.

Live

The wire — every change as it is detected

THE WIRE
$100K interior alterations issued · Etobicoke6h$55K interior alterations filed · Scarborough6h$1K interior alterations filed · West End6h$75K piping: sfd/semi filed · East York & East End6h$10K interior alterations issued · Etobicoke6h$50K second suite (new) issued · Scarborough6h$15K interior alterations filed · Downtown6h$10K interior alterations filed · North York6h$250K multiple projects issued · Downtown6h$1.4M interior alterations issued · East York & East End6h$10K deck filed · North York6h

Full activity feed →

GROUND Pro · private preview

From market intelligence to opportunity intelligence

GROUND Pro

Know what to pursue.

  • On-demand project intelligence briefs
  • Likely scopes & trade-fit analysis
  • Opportunity scoring
  • Competitive bid intelligence — who's bidding, who's low
  • Interactive drawing-set views on select projects
  • Coming next: alerts matched to your trade & territory

Explore GROUND Pro →

Weekly report GTA Construction Weekly — Sep 14–20, 2026 — 419 applications · 348 issued · $148.9M declared

Explore: map · permits · tenders · companies · activity feed · reports · Pro