Plumbing(PS) — revision 01
580 COMMISSIONERS ST, TorontoPermit details
- Application
- 25 107570 PLB rev 01
- Address
- 580 COMMISSIONERS ST, Toronto (M4M)
full property record — every permit and signal at this address
- Work
- Building Permit Related(PS)
- Structure
- Transit Station,Subway, Bus Terminal
- Status
- Revision Issued
- Applied
- 2026-03-27
- Issued
- 2026-04-09
- Declared value
- —
- Current use
- Transit - Bus Garage
- Proposed use
- Transit - Bus Garage
- Builder
- Owner-filed
Scope of work (as filed)
REV 01: The original design proposed replacing the existing gas-fired MAU and heating units. To align with the City¿s zero-emission requirement, the design has been revised to electric MAU and unit heaters.Plumbing - To install a wheel allignment machine and a wheeltrans bus lift (TTC)
Same application (5)
| Permit | Applied | Status |
|---|---|---|
| Building Additions/Alterations rev 00 Interior Alterations |
2025-01-22 | Permit Issued |
| Plumbing(PS) rev 00 Building Permit Related(PS) |
2025-01-22 | Permit Issued |
| Mechanical(MS) rev 00 Building Permit Related(MS) |
2025-01-22 | Permit Issued |
| Building Additions/Alterations rev 01 Interior Alterations |
2026-03-27 | Revision Issued |
| Mechanical(MS) rev 01 Building Permit Related(MS) |
2026-03-27 | Revision Issued |
Revisions and plumbing/mechanical/drain permits filed under the same application number.