back to all permits

Plumbing(PS) — revision 01

29 PRINCE ARTHUR AVE, Toronto

Permit details

Application
23 205315 PLB rev 01
Address
29 PRINCE ARTHUR AVE, Toronto (M5R)
Work
Building Permit Related(PS)
Structure
Office
Status
Revision Issued
Applied
2026-02-11
Issued
2026-03-02
Declared value
Current use
Office
Proposed use
Office
Builder
Owner-filed

Scope of work (as filed)

REVISION - add one room in the basement (Booth 015), revise the open waiting room 104 to an enclosed meeting room (Meeting 104) with accessible door added, revise the glazed partition at (Boardroom 105) from an operable partition, to a fixed partition with accessible doors, whereas previous mechanical drawings noted the requirement for fire dampers to be provided at all fire separations, the mechanical inspector has requested that all fire dampers are shown on the drawings. Mechanical drawings are updated to show dampersPlumbing - Interior alterations and 4-storey rear addition to existing 3-storey building.

Same application (3)

PermitAppliedStatus
Building Additions/Alterations rev 01
Multiple Projects
2025-04-14 Revision Issued
Building Additions/Alterations rev 02
Multiple Projects
2026-02-11 Revision Issued
Mechanical(MS) rev 01
Building Permit Related(MS)
2026-02-11 Revision Issued

Revisions and plumbing/mechanical/drain permits filed under the same application number.

GROUND intelligence

Is this project worth chasing?

Likely scopes · competitive activity · lifecycle stage · opportunity score · fit for your trade.

Analyze this project →