Building Additions/Alterations — revision 02
61 FRONT ST W, TorontoPermit details
- Application
- 25 116160 BLD rev 02
- Address
- 61 FRONT ST W, Toronto (M5J)
full property record — every permit and signal at this address
- Work
- Interior Alterations
- Structure
- Transit Station,Subway, Bus Terminal
- Status
- Under Review
- Applied
- 2026-08-25
- Issued
- —
- Declared value
- —
- Current use
- Transit
- Proposed use
- Transit
- Builder
- Owner-filed
Scope of work (as filed)
Rev # 2- Revision includes a new temporary stair pressurization system and sprinkler modifications to the existing stair following ramp removal. The scope comprises temporary ductwork and a pressurization fan for the stairwell during construction. Related to Blue Route Permit 25 116160 BLD 00 BA.REV: The revision include the removal of ramp T202 and associated partitions, a revision to a west partition to become exterior wall GB9, a revision to the door schedule, door B06A, to become an insulated door. Structurally, added new details for Ramp T202 demo, new column installation, and slab on grade. Mechanically, expanded demolition and new scope for fire protection, plumbing, and HVAC. Added electrical devices, lighting fixtures, and fire alarm devices to align with the architectural phasing.First phase of the Blue Route Reconfiguration under drawing package UAH102_TW. This includes creating a new 2hr FRR enclosure, a new temporary 1929 wall opening, constructing a temporary accessibility ramp, partially and temporarily removing areas of existing ceiling to move services as required, as well as relocating a firehose cabinet
Inferred opportunity scopes
DemolitionResidential alterationsDerived by rules from the permit text — an opportunity signal, not a statement that these packages are open or being bid.
Same application (5)
| Permit | Applied | Status |
|---|---|---|
| Building Additions/Alterations rev 00 Interior Alterations |
2025-02-12 | Inspection |
| Building Additions/Alterations rev 01 Interior Alterations |
2025-09-17 | Revision Issued |
| Plumbing(PS) rev 00 Building Permit Related(PS) |
2025-09-24 | Permit Issued |
| Mechanical(MS) rev 00 Building Permit Related(MS) |
2025-09-24 | Permit Issued |
| Mechanical(MS) rev 01 Building Permit Related(MS) |
2026-08-24 | Application Acceptable |
Revisions and plumbing/mechanical/drain permits filed under the same application number.
Is this project worth chasing?
Likely scopes · competitive activity · lifecycle stage · opportunity score · fit for your trade.
Analyze this project →Planning something similar?
If you're an owner or tenant planning comparable work, we'll tell you what it should cost — read from records like this one — and introduce insured contractors with a track record on it.