back to all permits

Building Additions/Alterations — revision 02

2672 BLOOR ST W, Toronto

Permit details

Application
22 141727 BLD rev 02
Address
2672 BLOOR ST W, Toronto ()
Work
Addition(s)
Structure
Transit Station,Subway, Bus Terminal
Status
Revision Issued
Applied
2025-08-20
Issued
2025-09-10
Declared value
Current use
Transit Station - Old Mill Station
Proposed use
Transit Station - Old Mill Station
Builder
Owner-filed

Scope of work (as filed)

REVISION 02 - Revision work involves shoring and micropile work as the excavation support systemREVISION 01 - Proposed changes the building permit documentation include the location and construction assembly of the south wall. The south wall has shifted north into the corridor and the assembly of the wall has been revised from cast-in-place concrete to 140mm concrete masonry with a sintered ceramic rainscreen cladding. The fire resistance rating of the exposed building face has been updated to 1hr on drawing AF03 to be consistent with the requirements of OBC Table 3.2.3.7 as noted on AA02. To add 2 new elevators to TTC's Old Mill Station to accommodate Accessibility_ 110 m2 above garde and 148 m2 below. Shoring for excavation 37 mSee 22-141983 ALT

Inferred opportunity scopes

Shoring & excavationResidential alterations

Derived by rules from the permit text — an opportunity signal, not a statement that these packages are open or being bid.

Same application (2)

PermitAppliedStatus
Building Additions/Alterations rev 01
Addition(s)
2024-07-08 Revision Issued
Building Additions/Alterations rev 03
Addition(s)
2025-11-12 Revision Issued

Revisions and plumbing/mechanical/drain permits filed under the same application number.

GROUND intelligence

Is this project worth chasing?

Likely scopes · competitive activity · lifecycle stage · opportunity score · fit for your trade.

Analyze this project →