Building Additions/Alterations — revision 01
1552 WESTON RD, TorontoPermit details
- Application
- 24 206295 BLD rev 01
- Address
- 1552 WESTON RD, Toronto (M9N)
full property record — every permit and signal at this address
- Work
- Addition(s)
- Structure
- Other
- Status
- Refusal Notice
- Applied
- 2025-11-06
- Issued
- —
- Declared value
- —
- Current use
- Affordable Housing
- Proposed use
- Affordable Housing
- Builder
- Owner-filed
Scope of work (as filed)
Revision 01 -Property lines have been updated based on the recent survey. Additional structural floor plans were added for clarification on site.1550 and 1552 Weston Road are now separated with no connection in the interior. Indoor amenity space, exit requirements and fire separation have all been maintained in the revised floor plan.Proposed 8-storey addition featuring 50 affordable housing units. approved under the City's Open Door Affordable Housing Project by City Council.
Inferred opportunity scopes
Residential alterationsDerived by rules from the permit text — an opportunity signal, not a statement that these packages are open or being bid.
Same application (6)
| Permit | Applied | Status |
|---|---|---|
| Building Additions/Alterations rev 00 Addition(s) |
2024-08-30 | Inspection |
| Mechanical(MS) rev 00 Building Permit Related(MS) |
2024-08-30 | Inspection |
| Plumbing(PS) rev 00 Building Permit Related(PS) |
2024-08-30 | Inspection |
| Drain and Site Service rev 00 Site Service |
2024-11-14 | Inspection |
| Fire/Security Upgrade rev 00 Building Permit Related(FS) |
2025-01-27 | Application On Hold |
| Drain and Site Service rev 00 Building Permit Related (DR) |
2025-11-04 | Permit Issued |
Revisions and plumbing/mechanical/drain permits filed under the same application number.
Is this project worth chasing?
Likely scopes · competitive activity · lifecycle stage · opportunity score · fit for your trade.
Analyze this project →Planning something similar?
If you're an owner or tenant planning comparable work, we'll tell you what it should cost — read from records like this one — and introduce insured contractors with a track record on it.