Small Residential Projects — revision 05
100 STRATHALLAN BLVD, TorontoPermit details
- Application
- 21 248596 BLD rev 05
- Address
- 100 STRATHALLAN BLVD, Toronto (M5N)
- Work
- Multiple Projects
- Structure
- SFD - Detached
- Status
- Revision Issued
- Applied
- 2026-05-08
- Issued
- 2026-05-25
- Declared value
- —
- Current use
- Sfd
- Proposed use
- Sfd
- Builder
- Owner-filed
Scope of work (as filed)
REV 05: SLOPE SINK AND BAR SINK ADDED IN BASEMENT, BAR SINK ADDED IN FRONT FRONT ISLAND AT MAIN FLOOR AND COFFEE SINK ADDED AT THIRD FLOOR. Rev 04 - REFER TO CLOUDED AREA NUMBER 4. GABLE ROOF ROOF AT REAR CHANGED TO HIP ROOF, MECHANICAL LOCATION CHANGED IN BASEMENT, DORMERS AT EAST AND WEST ELEVATIONS REDUCED IN SIZE AND EXISTING CEILING AT FRONT OF DWELLING UPDATED. REV 03: REVISION TO ADD NEW WINDOW AT EAST ELEVATION DORMERREV 02: REVISION TO BUILDING PERMIT 21 248596 BLD 01 SR, REFER TO CLOUDED AREA NUMBER 2 WINDOW SIZE CHANGE AT NORTH EAST CORNER OF DWELLINGREVISION 01 PER DRAWINGSREAR ADDITION + INTERIOR ALTERATIONS + UNDERPINNING
Inferred opportunity scopes
UnderpinningResidential alterationsDerived by rules from the permit text — an opportunity signal, not a statement that these packages are open or being bid.
Same application (7)
| Permit | Applied | Status |
|---|---|---|
| Small Residential Projects rev 01 Multiple Projects |
2025-08-12 | Revision Issued |
| Small Residential Projects rev 02 Multiple Projects |
2025-12-05 | Revision Issued |
| Small Residential Projects rev 03 Multiple Projects |
2026-01-08 | Revision Issued |
| Mechanical(MS) rev 00 Building Permit Related(MS) |
2026-01-09 | Inspection |
| Mechanical(MS) rev 01 Building Permit Related(MS) |
2026-01-26 | Revision Issued |
| Small Residential Projects rev 04 Multiple Projects |
2026-01-30 | Revision Issued |
| Mechanical(MS) rev 02 Building Permit Related(MS) |
2026-05-05 | Revision Issued |
Revisions and plumbing/mechanical/drain permits filed under the same application number.
Is this project worth chasing?
Likely scopes · competitive activity · lifecycle stage · opportunity score · fit for your trade.
Analyze this project →