back to all permits
Partial Permit
1200 SHEPPARD AVE E, TorontoPermit details
- Application
- 24 244183 FND rev 00
- Address
- 1200 SHEPPARD AVE E, Toronto (M2K)
- Work
- Partial Permit - Foundation
- Structure
- Apartment Building
- Status
- Application Acceptable
- Applied
- 2025-10-08
- Issued
- —
- Declared value
- —
- Current use
- Vacant
- Proposed use
- Mixed Use Building
- Builder
- Owner-filed
Scope of work (as filed)
Part Permit - Phase 3 - Build 3rd tower (Tower 3B) and part of associated podium and U/G parking garage. Development is for creation of a mixed use development comprised of an existing office development, and three new mixed use buildings with 5 new residential towers for a total maximum gross floor area of 3.94 times the area of the lot. A maximum of 1,478 dwelling units and a total combined gross floor area of 159,779 square metres is permitted.
Same application (3)
| Permit | Applied | Status |
|---|---|---|
| New Building rev 00 New Building |
2024-11-27 | Examiner's Notice Sent |
| Mechanical(MS) rev 00 Building Permit Related(MS) |
2024-12-13 | Examiner's Notice Sent |
| Partial Permit rev 00 Partial Permit - Structural Framing |
2025-10-08 | Application Acceptable |
Revisions and plumbing/mechanical/drain permits filed under the same application number.
GROUND intelligence
Is this project worth chasing?
Likely scopes · competitive activity · lifecycle stage · opportunity score · fit for your trade.
Analyze this project →