Plumbing(PS) — revision 01
62 HARTLEY AVE, TorontoPermit details
- Application
- 22 220030 PLB rev 01
- Address
- 62 HARTLEY AVE, Toronto (M6E)
full property record — every permit and signal at this address
- Work
- Building Permit Related(PS)
- Structure
- 2 Unit - Detached
- Status
- Revision Issued
- Applied
- 2025-09-12
- Issued
- 2025-09-26
- Declared value
- —
- Current use
- Sfd
- Proposed use
- 2 Units-Detached
- Builder
- Owner-filed
Scope of work (as filed)
Rev 01: Revision to add kitchen, bathroom and laundry in basement, convert to new Secondary Suite, in relation to BLD rev 03Plumbing - Proposal for two storey addition on top of the existing house, rear 3storey addition, interior alteration thorughout, basement underpinning, new rear deck and basement walk-out.
Inferred opportunity scopes
Secondary suitesUnderpinningDerived by rules from the permit text — an opportunity signal, not a statement that these packages are open or being bid.
Same application (2)
| Permit | Applied | Status |
|---|---|---|
| Small Residential Projects rev 03 Multiple Projects |
2025-09-12 | Revision Issued |
| Drain and Site Service rev 01 Building Permit Related (DR) |
2025-09-12 | Revision Issued |
Revisions and plumbing/mechanical/drain permits filed under the same application number.
Is this project worth chasing?
Likely scopes · competitive activity · lifecycle stage · opportunity score · fit for your trade.
Analyze this project →Planning something similar?
If you're an owner or tenant planning comparable work, we'll tell you what it should cost — read from records like this one — and introduce insured contractors with a track record on it.