New Houses — revision 03
15 ALBANI ST, TorontoPermit details
- Application
- 22 142125 BLD rev 03
- Address
- 15 ALBANI ST, Toronto (M8V)
full property record — every permit and signal at this address
- Work
- New Building
- Structure
- 2 Unit - Detached
- Status
- Revision Issued
- Applied
- 2026-04-01
- Issued
- 2026-04-17
- Declared value
- —
- Current use
- Sfd
- Proposed use
- Duplex
- Builder
- Owner-filed
Scope of work (as filed)
Revision 01 - Revision to structural design------------------------------------------------------------REVISION - below-grade entrance location. Same size, but added a landing and moved the access to the side. Extension of roof above second-floor balcony on rear wall. Extension of the third floor to have a roof above the existing second-floor balcony on the rear wall.Enlargement of the second-floor rear balcony.Delete 2 windows in the West facade on the Main Floor
Inferred opportunity scopes
Residential alterationsDerived by rules from the permit text — an opportunity signal, not a statement that these packages are open or being bid.
Same application (4)
| Permit | Applied | Status |
|---|---|---|
| New Houses rev 01 New Building |
2025-03-17 | Revision Issued |
| Mechanical(MS) rev 01 Building Permit Related(MS) |
2025-03-17 | Revision Issued |
| New Houses rev 02 New Building |
2025-09-11 | Revision Issued |
| Mechanical(MS) rev 02 Building Permit Related(MS) |
2026-04-16 | Revision Issued |
Revisions and plumbing/mechanical/drain permits filed under the same application number.
Is this project worth chasing?
Likely scopes · competitive activity · lifecycle stage · opportunity score · fit for your trade.
Analyze this project →Planning something similar?
If you're an owner or tenant planning comparable work, we'll tell you what it should cost — read from records like this one — and introduce insured contractors with a track record on it.